File #: PM-27-009    Version: 1 Name:
Type: Budget Postponed Motion Status: Agenda Ready
File created: 11/12/2026 In control: Committee of the Whole
On agenda: 11/24/2026 Final action:
Title: Council-039 – Oakmont Trail 1 Notice given by: Councillor Korotash

TAMRMS#:  B05

5.3

 

title

Council-039 - Oakmont Trail 1

Notice given by: Councillor Korotash

 

label

BUDGET POSTPONED MOTION:

recommendation

 

That Capital Project Charter Council-039 (Oakmont Trail 1) be funded in the 2027 budget and that the funding source used shall be the Growth Stabilization Reserve.

 

body

Administration’s Understanding of the Intent of the Motion:

 

That if passed, Capital Project Charter Council-039 (C-039) is funded in 2027 from the Growth Stabilization Reserve to support construction of Oakmont Trail Section 1.

 

SUMMARY

 

This report provides Council with background and strategic context related to C-039.

 

ALIGNMENT TO COUNCIL DIRECTION OR MANDATORY STATUTORY PROVISION

 

N/A

 

BACKGROUND AND DISCUSSION

 

Oakmont Trail Section 1 (Old Bellerose Drive (see Figure 1)) provides pedestrian connectivity between St. Albert’s Red Willow Trail System,  the future development contemplated in the NE Area Structure Plan and the proposed future trail development in Sturgeon County.

 

Trail Section 1 overlaps with lands that will be disrupted to deliver the NE Servicing project. The existing NE Servicing charter scope only returns the trail section to the base level conditions. C-039’s scope contemplates a coordinated effort with the NE Servicing project and completing the trail work to a full trail standard (e.g., asphalt, benches, signage, waste receptacles, bollards).

 

Municipal portions of Trail Section 3 were completed in 2026. The remainder of the trail section 3 is targeted for 2027, with work to be completed through the Riverbank Landing property by Boudreau Developments. Trail Section 2 of the project was removed by Council (PM-23-049) from the 10-Year Capital Plan, with connectivity provided through existing sidewalks and streets.

If this charter is not funded through the 2027 budget, in alignment with projected advancement of NE Servicing, Administration recommends removal of the charter from the 10-Year Capital Plan. The work can be re-introduced in a future charter which would reflect site conditions and updated costing at that time.

 

There are foreseeable cost implications from decoupling the scope of work from NE Servicing. These include:

•                     Redevelopment of lands;

•                     Additional engineering, tendering, contract administration, and project management costs;

•                     Additional contractor mobilization and demobilization costs; and

•                     Reduced construction efficiencies such as disturbance of previously completed surface work.

 

STAKEHOLDER COMMUNICATIONS OR ENGAGEMENT

 

Public engagement was conducted as part of planning for all trail sections within the Oakmont Trail project (see Figure 1).

 

IMPACTS OF RECOMMENDATION(S)

 

Financial:

If approved, C-039 would be funded from the Growth Stabilization Reserve, which has sufficient funds. This will reduce the amount of reserve dollars available for future prioritized capital projects.

 

Compliance & Legal:

None at this time.

 

Program or Service: 

Should this trail section remain unfinished, trail connectivity from the Red Willow Trail System into Erin Ridge North and Sturgeon County will remain incomplete.

 

Organizational:

None at this time.

 

Risks

Should NE Servicing not proceed, C-039 does not have sufficient funds to complete Trail Section 3 as it relies on economies of scale gained through existing construction in the NE Servicing project.

 

Delays in NE Servicing may result in cost implications and require a revisit to the value of this charter.

 

ALIGNMENT TO PRIORITIES IN COUNCIL’S STRATEGIC PLAN

 

Initiative aligned with Strategic Plan:

Not Applicable

 

ALIGNMENT TO LEVELS OF SERVICE DELIVERY

 

D. Land Use and Development

 

body

Report Date: November 24, 2026

Author(s):  Craig Cameron, Manager, Parks and Community Partnerships

Department:  Recreation and Parks

Department Director:  Daniele Podlubny

Managing Director: Dinu Alex

Chief Administrative Officer: William Fletcher