TAMRMS#: B05
6.14
title
Development Engineering Coordinator Position
Notice given by: Councillor Hughes
label
BUDGET POSTPONED MOTION:
recommendation
That the Development Engineering Coordinator position for $98,700 is unfunded.
body
Administration’s Understanding of the Intent of the Motion:
That the operating business case for Development Engineering Coordinator position be unfunded and $98,700 be transferred to the Growth Stabilization Reserve.
SUMMARY
The Development Engineering team is currently responsible for overseeing 389 active Development Agreement (DA) and Development Permit (DP) files, with an annual workload exceeding 4,200 hours for inspections and field reviews alone. Analysis indicates that approximately 4.7 FTEs are required during the construction season to support existing development activity. Current staffing consists of only three specialized technical resources, resulting in sustained capacity pressures and limited ability to address historical backlog.
Anticipated growth in the west and northeast development areas will further increase review, inspection, and asset acceptance requirements, creating additional service delivery risks without increased staffing resources.
With the approval of the proposed motion, maintaining the current level of service will not be sustainable with available resources in the short and long term.
ALIGNMENT TO COUNCIL DIRECTION OR MANDATORY STATUTORY PROVISION
N/A
BACKGROUND AND DISCUSSION
The Development Engineering team is responsible for the review, inspection, asset acceptance, and transfer of municipal infrastructure associated with Development Agreements (DAs) and major Development Permits (DPs). There are currently 389 active development files requiring ongoing oversight, including subdivision developments, multifamily, commercial, institutional, and industrial projects. The team currently consists of two Development Engineering Supervisors and one Development Engineering Coordinator. Supervisors are responsible for the more complex and higher-risk developments, while the coordinator manages less complex projects, including infill developments, smaller multifamily projects, and select DA files.
Based on historical averages, each new DA requires approximately 163 hours in year one, with an additional 40 hours annually during warranty and closeout periods, while each DP requires approximately 58 hours of review and inspection effort. With an average of 14 new DAs and 24 new DPs annually, the estimated workload exceeds 4,200 hours from May to October for inspections and field reviews alone, equating to approximately 4.7 FTEs required during the construction season (900 hours per person), before accounting for drawing reviews, security administration, project closeout activities, asset transfers, engineering standards updates, and other administrative responsibilities.
Analysis of Average Summer Hours for Development Projects:
|
Item |
Average Annual Volume (No. Of projects) |
Average Hours per project |
Average Summer Total hours |
|
New Development Agreement (DA) |
14 |
163 |
2282 |
|
Ongoing DA warranty review and asset acceptance |
14 |
40 |
560 |
|
New Development Permits (DP) |
24 |
58 |
1392 |
|
Total Annual Review Requirement |
n/a |
n/a |
4234 |
Current staffing levels are insufficient to sustainably manage existing development activity and maintain expected service levels. Staff are balancing construction inspections, engineering reviews, security drawdown assessments, warranty inspections, project closeout documentation, CCTV review of underground infrastructure installations, asset transfers, standards development, and stakeholder coordination across nearly 400 active files. While some routine inspections have been supplemented through summer student support, the technical nature of development construction reviews requires experienced staff and limits opportunities for delegation. In addition, many older development files remain active and require ongoing administration, with limited capacity available to address historical backlog. Planned growth towards west and northeast growth lands will further increase development activity and place additional pressure on existing resources.
STAKEHOLDER COMMUNICATIONS OR ENGAGEMENT
Not applicable.
IMPACTS OF RECOMMENDATION(S)
Financial:
If the motion passes, $98,700 in unused assessment growth will be transferred to the Growth Stabilization Reserve in accordance with section ii. of Council Policy C-FS-05 Budget and Taxation Guiding Principles 14(b):
ii. Any portion of the 45 per cent of growth revenue not applied to business cases or capital charters during the budget process shall be transferred to the Growth Stabilization Reserve.
Compliance & Legal:
None at this time.
Program or Service:
If the motion passes, development review timelines will continue to increase beyond the service level established, potentially impacting developer timelines and customer service expectations. Additionally, reduced inspection capacity may result in municipal infrastructure installations that do not meet Municipal Engineering Standards or approved development requirements.
The reduced capacity would also slow down the clearance of historical file backlogs and may affect organizational resilience by increased dependence on a small number of specialized technical resources should staff capacity be reduced further through vacancies, absences, or turnover.
Organizational:
Continuing to rely on existing staff to maintain service levels with the increased volume of work in the development area increases the risk of overtime, and eventual loss of productivity resulting in staff burnout and reduced morale. Staff may also be susceptible to errors and omissions to meet the demand placed on them by the development community. Ultimately, to maintain the resource's health and safety, service levels would have to be adjusted which will not be well received by the development community who are used to the standard set in the previous years.
Projected growth within west and northeast development areas will further widen the gap between workload demands and available staffing resources, increasing service delivery risks over time.
Risks
The following risks are anticipated if the motion passes.
People: With reduced staff capacity development review timelines may increase, inspection coverage may be reduced, and existing staff may continue to rely on unsustainable workloads to meet service expectations.
Stakeholders: Potential impact on relationships with the development community and the City’s reputation with reduced service levels resulting from compromised staff capacity.
Asset Management - Failure to identify construction deficiencies during installation and warranty periods can lead to premature infrastructure failures, increased maintenance costs, costly reconstruction, and long-term financial impacts to the City.
ALIGNMENT TO PRIORITIES IN COUNCIL’S STRATEGIC PLAN
Initiative aligned with Strategic Plan:
None at this time
ALIGNMENT TO LEVELS OF SERVICE DELIVERY
D.1.2 Issuance of Land Use and Development Permits and Licenses_ D.1.2.g Technical Drawing Reviews: Drawing evaluation is done within 4-6 weeks. Response times may vary due to the complexity of the request or the volume of requests.
body
Report Date: November 24, 2026
Author(s): Johnathan Reid
Department: Engineering
Department Director: Dawny George
Managing Director: Adryan Slaght
Chief Administrative Officer: William Fletcher