File #: PM-27-043    Version: 1 Name:
Type: Budget Postponed Motion Status: Agenda Ready
File created: 11/13/2026 In control: Committee of the Whole
On agenda: 11/24/2026 Final action:
Title: Lacombe Park Lake Parking Lot Paving Notice given by: Councillor Hughes
Attachments: 1. Attachment 1_ City Gravel Parking Lots

TAMRMS#:  B05

5.11

 

 

 

 

title

Lacombe Park Lake Parking Lot Paving

Notice given by: Councillor Hughes

 

label

BUDGET POSTPONED MOTION:

recommendation

 

That the design portion for the Lacombe Park Lake parking lot paving is approved from the Capital Fund in an amount provided as a confidential attachment to PM-27-043.

 

body

 

Administration’s Understanding of the Intent of the Motion:

 

Administration understands that this motion seeks to fund the completion of detailed design for paving the existing Lacombe Lake parking lot, to which Administration provided the estimated cost in the Attachment 2- Confidential PM-27-043 Lacombe Lake Parking Lot Paving, which is anticipated to provide completion of detailed design phase and develop a tender ready design package for construction.

SUMMARY

 

•                     In 2025, a postponed motion to add ENGS-083: Lacombe Lake Parking Lot Paving to the 10-Year Growth Capital Plan was debated by Council. This motion was defeated, and as a result, Administration has not advanced any plans to pave the existing gravel parking lot. The associated project charter (ENGS-083) was subsequently removed from capital planning.

 

•                     The City currently owns a total of sixteen (16) gravel parking lot structures throughout the community. Some of these sites are maintained directly by the City while others are maintained by private lease holders under existing agreements.

 

•                     There are no plans or approved projects to pave or otherwise modify any existing gravel parking structures. Typically, such improvements would result from site re-development or land use changes that necessitates a re-design of the parking area.

 

•                     The estimated cost to complete design for the Lacome Lake Parking Lot is provided in the Attachment 2- Confidential PM-27-043 Lacombe Lake Parking Lot Paving.

 

 

 

ALIGNMENT TO COUNCIL DIRECTION OR MANDATORY STATUTORY PROVISION

 

On May 6, 2025, Council defeated the following motions:

 

PM-26-004

“That ENGS-083 Lacombe Lake Parking Lot Paving is added to the 10-Year Growth Plan.”

 

 

BACKGROUND AND DISCUSSION

 

The Confidential attachment (Confidential PM-27-043 Lacombe Lake Parking Lot Paving) provides preliminary estimates for the design and subsequent construction of the Lacombe Park Lake Parking Lot Paving.

 

This response is confidential in accordance with sections 26(1)(b), 29(1)(a), 29(1)(c), and 30(1)(c) of the Access to Information Act.

 

To share background on the current state of City owned parking lot projects:

 

•                     The RMR Project Charter, ENGS-014 Paved Parking Lot Program supports the maintenance and rehabilitation of paved parking lots only. The program does not include scope of work to transition an existing gravel parking to a paved structure.

 

•                     The paving of a gravel parking lot would typically be aligned to new site development to/on the adjacent land use that the parking lot services, where development or significant changes to the adjacent land use occur, and funding would be requested to undertake parking lot paving alongside the other capital improvements required to support the new development. In such cases, hard-surfaced parking facilities would be required to meet development standards and permitting requirements.

 

•                     Converting a gravel parking lot to a paved facility involves substantial design and construction scope. Considerations include stormwater management infrastructure, replacement of existing surface drainage systems, installation of curbs and concrete works, utility modifications where required, and construction of the asphalt pavement structure. Under current conditions, the City's gravel parking lots generally function effectively for their intended use, require relatively low maintenance, and represent a cost-effective service level. However, Administration recognizes that gravel surfaces may present accessibility and mobility challenges for some users.

 

•                     In 2018, Council directed the creation of a project charter COUN-035, which examined the scope and developed cost estimates to perform upgrades to existing gravel structure parking lots through paving. In 2019, this charter was retitled to ENGS-076: City Parking Lot Structure Upgrades and maintained the same overall scope and funding requests.

 

•                     Between 2019 and 2022, the project charter ENGS-076 did not score sufficiently high through the City’s capital prioritization process and Administration subsequently recommended its removal from the 10-year Capital Plan in 2022.

o                     Administration recommended the elimination of the charter in alignment with recommendations to maintain existing gravel parking structures until such time that site improvements or development occurs on adjacent facilities that would require hard surface parking lots.

o                     Council approved the removal of the charter through CB-21-018 on March 21, 2021, and the project was subsequently discontinued.

 

•                     Council may direct Administration to bring forward an updated charter for an overarching city-wide gravel parking lot paving program or, alternatively, direct Administration to advance improvements at a specific location, as contemplated through the current postponed motion.

 

•                     For Council’s awareness when considering a project charter associated with an overarching program to pave the full inventory of current gravel parking lots, the City currently has sixteen (16) sites. An inventory of these locations is in Attachment 1-City Gravel Parking Lots. It should be noted that the Botanic Parking Lot was paved in 2026 following specific Council direction and approval of funding.

 

•                     Should Council wish to prioritize improvements to specific parking lots, Administration recommends providing clear direction regarding the desired locations and priorities. In the absence of such direction, Administration would be required to establish prioritization criteria that may not fully align with Council's intended outcomes and would anticipate that all gravel parking lots could eventually be considered for future upgrades.

o                     Within the previous charter (ENGS-076), the Lacombe Lake parking lot was identified as highest priority location for improvement (of the gravel lots).

 

•                     In 2025, Council debated two (2) individual motions related to targeted funding and scope to design and pave two separate gravel parking lots. The sites were:

o                     Botanic Parking Lot - The motion was approved, and funding for design and construction resulted the parking lot being paved in 2026.

o                     Lacombe Lake Parking Lot - The motion was defeated, and the associated charter for detailed design and paving was subsequently removed from the Capital Plan.

 

•                     Previous analysis and reporting to Council estimated the construction costs to pave the Lacombe Lake parking lot (provided in Attachment 2- Confidential PM-27-043 Lacombe Lake Parking Lot Paving). 

 

•                     Through previously approved funding, Administration initiated a project in 2026 to develop standards and specifications for the City’s gravel parking lots, together with detailed condition assessments to inform on long-term asset management strategy.

o                     Administration is in the process of developing these standards and the full asset management plan, to which a “new” future RMR charter associated with gravel structures may be developed and informed for scope and costs based upon the completed assessments and recommended maintenance strategy. It should be noted that this work is intended to support the continued maintenance of gravel parking lots and does not contemplate the systematic redesign or paving of existing gravel structure(s).

 

 

STAKEHOLDER COMMUNICATIONS OR ENGAGEMENT

 

No engagement with residents or stakeholders has occurred in regard to changes of the Lacombe Lake Parking Lot.

 

 

IMPACTS OF RECOMMENDATION(S)

 

Financial:

If approved, funding as per the cost shared in Attachment 2- Confidential PM-27-043 Lacombe Lake Parking Lot Paving, would come from the Capital Reserve and will reduce the amount of capital dollars available for future prioritized capital projects as well as emergent capital items.

 

Although this motion does not assume approval of funding for construction, investment in design is best suited to projects aligned with Council’s priority for construction.

 

Compliance & Legal:

None at this time.

 

Program or Service: 

1. Site improvements to existing gravel parking lots will deliver the benefit of improved mobility accessibility. Gravel structures may be difficult to maneuver on for users facing mobility challenges, who may or may not utilize mobility aids. A hard surface under good conditions better supports ease of movement under such circumstances.

 

2. Existing gravel sites operate and function well with low maintenance costs in comparison to paved parking lot sites.

                     - RMR funding associated with asphalt and concrete repair or road marking material replacement are not required with gravel structures.

 

Organizational:

None at this time.

 

Risks

Stakeholder expectation of approved design funding leading to construction funding may be a low risk if the actual construction and paving of the site is not a council or capital project priority. The design completed would be kept for construction readiness.

 

ALIGNMENT TO PRIORITIES IN COUNCIL’S STRATEGIC PLAN

 

 

Initiative aligned with Strategic Plan:

None at this time.

 

ALIGNMENT TO LEVELS OF SERVICE DELIVERY

 

N/A

 

 

body

Report Date: November 24, 2026

Author(s): Dean Schick, Transportation Manager

Department: Engineering Services

Department Director:  Dawny George

Managing Director:  Adryan Slaght

Chief Administrative Officer: William Fletcher